AlcosanWhiting, IN
Power distribution centers
Project Overview
Sargent Electric was responsible for a comprehensive electrical distribution upgrade at Alcosan’s water treatment facility, enhancing critical infrastructure across multiple buildings within the plant.
The project included installation of a new 13.8kV–5kV transformer, underground 5kV duct banks, and multiple switchgear systems across substations and facility buildings. Sargent also installed motor control centers, unit substations, and a new 5kV feeder connecting key buildings, while upgrading the facility’s communication backbone with new fiber. In addition, automatic transfer switches were installed to improve system reliability and redundancy.
This upgrade supports the modernization and resiliency of the water treatment facility, improving power distribution, system reliability, and operational continuity for critical municipal infrastructure.
This upgrade includes:
- Installation of new 13.8kV – 5kV transformer
- Installation of 5kV duct banks underground
- Switchgear installation in new 650 substation
- Installation of switchgear in building 810 and building 410
- Installation of Motor Control Centers (MCC) in building 810
- New unit substation installed in building 410 and building 900
- 5kV feeder installed from the substation to buildings 810 and 410.
- Replacement of existing fiber with new fiber
- Installation of new Automatic Transfer Switches (ATS) in building 110, fed from building 716.