Locations

Pittsburgh, PA (Headquarters)

2740 Smallman Street
Pittsburgh, PA 15222

Erie, PA

151 E 10th Street
Erie, PA 16501

East Chicago, IN

601 East Chicago Avenue
East Chicago, IN 46312

Indianapolis, IN

10710 Pendleton Pike, Ste. A,
Indianapolis, IN 46236

Lewiston, ME

45 Alfred A. Plourde Parkway
Lewiston, ME 04240

Hermon, ME

32 Lexington Drive, Unit 2,
Hermon, ME 04401

Columbus, OH

980 Clay Craft Road
Gahanna, OH 43230

De Pere, WI

3148 Mid Valley Drive
De Pere, WI 54115

Avantus Kitt BESSEloy, Arizona

Battery Energy Storage

Project Overview

Sargent Electric served as the EPC contractor for the battery energy storage (BESS) portion of the Kitt Solar project in Eloy, Arizona. Spanning 640 acres, the facility is set to generate 100 MW of solar energy and 400 MWh of energy storage, supplying renewable power to 32,000 Arizona homes while offsetting more than 200,000 metric tons of carbon dioxide annually.


Working directly with Fluence Energy, Sargent provided procurement and construction services across civil, structural, electrical, communications and fire-safety scopes. Sargent's work included installation of the BESS 34.5 kV feeders into the project substation and completion of the medium-voltage terminations. More than 52,000 feet of cable was prefabricated, kitted and shipped to project site, which streamlined field installation.


Faced with schedule pressures outside of its control, Sargent successfully achieved all major project milestones. A scope originally expected to take five to six months was completed in just three months, demonstrating the team's ability to rapidly mobilize resources while maintaining quality and safety standards in a demanding desert environment. The project's commitment to excellence was recognized by Avantus leadership during a 2026 site safety and environmental audit.

Project Scope

 
  • EPC contractor
  • 400 MWh storage capacity
  • 112 battery enclosures
  • 28 MV inverters & transformers
  • Over 52,000 ft. cable prefabricated and kitted
  • 3-month accelerated work schedule
  • Zero recordable safety incidences