Line Rehab 498-51 Tionesta #3Tidioute, PA
Penelec LTIIP Program
Project Overview
The Line Rehab 498-51 Tionesta #3 project was part of the Penelec LTIIP program with FirstEnergy, focused on upgrading critical transmission infrastructure in Tidioute, PA within the Allegheny National Forest. The project called for the replacement of two 3-pole dead-end structures, one positioned on each side of a ravine crossing over a highway.
Sargent Electric was responsible for executing this complex installation in a remote and environmentally sensitive location. The work required hand digging for eight anchors and six poles, as well as the use of specialized aerial equipment. An MD-500 helicopter was utilized to transport personnel, materials, and tools to each structure location, while a Sikorsky S61N helicopter was used to install the poles. The existing conductor was transferred, and the project required a planned outage and detailed coordination with FirstEnergy and helicopter partners.
This project supports the reliability and resiliency of the regional power grid, ensuring continued service in challenging terrain while modernizing critical infrastructure through innovative construction methods and precise logistical coordination.
Let’s discuss your next project.