Squirrel Hill TunnelPittsburgh, PA
Penndot tunnel project
Project Overview
The Squirrel Hill Tunnel project involved major system upgrades to one of Pittsburgh’s key transportation corridors, with Sargent Electric working alongside PennDOT to modernize electrical and control infrastructure.
Sargent’s scope of work included installing nearly 1,300 new high-pressure sodium luminaires, replacing power distribution with approximately 115,000 feet of conduit and 850,000 feet of fire-rated cable, and fabricating 750 stainless steel junction boxes with thousands of supports and anchoring systems.
A new fiber optic network was also installed to support a state-of-the-art Tunnel Control System (TCS), integrating lighting, ventilation, communications, and emergency systems into a centralized platform. Additional upgrades including emergency telephones, CCTV cameras, fire cabinets, and life safety monitoring systems enhance safety, visibility, and real-time operational control.
Project Solutions
- New raceway and circuitry
- 40+ remote emergency telephone cabinets
- 34 sets of fire cabinets
- 8 pressurized CCTV cameras
- New AM/ FM radio systems