Locations

Pittsburgh, PA (Headquarters)

2740 Smallman Street
Pittsburgh, PA 15222

Erie, PA

151 E 10th Street
Erie, PA 16501

East Chicago, IN

601 East Chicago Avenue
East Chicago, IN 46312

Indianapolis, IN

10710 Pendleton Pike, Ste. A,
Indianapolis, IN 46236

Lewiston, ME

45 Alfred A. Plourde Parkway
Lewiston, ME 04240

Hermon, ME

32 Lexington Drive, Unit 2,
Hermon, ME 04401

Columbus, OH

980 Clay Craft Road
Gahanna, OH 43230

De Pere, WI

3148 Mid Valley Drive
De Pere, WI 54115

Wabtec ModernizationPittsburgh, PA

Regenerative power system

Project Overview

The Wabtec Modernization project aimed to design and implement a regenerative power system capable of harnessing energy from Cells 3, 4, 5, and 6. The system was required to achieve full power regeneration at a continuous 100% duty cycle, include full automation and integration into existing test cell control systems, monitor all voltages and currents, and provide alarms and system I/O.

The system was designed to function within power grid specifications without interfering with existing equipment or processes, ensure harmonics remained within standard industrial limits, and include all necessary filtering to return clean power to the grid. Additionally, Sargent was responsible for maintenance and operator training, as well as comprehensive engineering services including power one-lines, equipment specifications, installation instructions and supervision, power studies, harmonic studies, control design, and drive design.